
Plastic sheet layer for tunnel DRGA 2 DéPlastic sheet layer for tunnels, with a hydraulic recovering sheet DRGA2
This machine is done for intensive utilization. It can also be used to lay the mulching sheet on asparagus mound. It is working with 500 holes sheet or P17 sheet, directly on any cultivation.
The roll lading is done easily. The centering roll is done by
a bi conical roll cage.
Its size allows to force the alignment of the arch.
The recovering sheet with earth is done by moldboards mounted on a deformable hydraulic parallelogram frame and it is commanded by electronics with a handle control.

Back
